Toyota Indus

Welcome to Toyota Pakistan

  • HOME
    • toyota

      Showroom

      Corolla X
      Find Out More
      Yaris
      Find Out More
      Camry Hybrid
      Find Out More
      Prius Hybrid
      Find Out More
      Corolla Cross
      Find Out More
      Fortuner
      Find Out More
      Fortuner GR-S
      Find Out More
      Revo
      Find Out More
      Revo GR-S
      Find Out More
      Hilux E (Standard)
      Find Out More
      Corolla Cross
      Find Out More
      Hilux Single Cabin
      Find Out More
      Land Cruiser Prado
      Find Out More
      Land Cruiser 300
      Find Out More
      Hiace Deluxe
      Find Out More
      Hiace
      Find Out More
      Coaster
      Find Out More
      Fortuner GR-S
      Find Out More
      Revo GR-S
      Find Out More
  • CORPORATE
  • Start Your Impossible
  • Contact Us

Research on Traffic Congestion 2012-13

Traffic congestion has become a serious problem for Karachi City, and with every passing day it is going from bad to worst. It not only causes inconvenience to all of us, it’s also costing us in terms of excess fuel consumption and loss of precious time etc.
In order to quantify this economic cost, IMC carried out a research project “Toyota – Research on Traffic Congestion” (T-RTC) being undertaken on National High in collaboration with NED University of Engineering & Technology, Karachi. This study is the first of its kind in the country, and is not only beneficial for industries to ascertain the role of traffic congestion in their budgeting and cost borne by them due to traffic delays but also helps relevant authorities to take corrective measures.

 

RESEARCH FINDINGS:

 

NED research team gathered various traffic parameters data over 12 months, incorporating seasonal fluctuation, using professional equipment designed for such researches. The data was then analysed using statistical software/tools to determine key findings which are as follows:

  1. The traffic volume at peak hours stood at ‘3,500 vehicles/hour’ against the road design capacity of ‘3,400 vehicles/hour’ which results in massive congestion at peak hours. Moreover, with encroachments at various points along the road, the road design capacity reduces significantly.
  2. The free flow time from Star Gate intersection to Steel Mills intersection is 17 minutes at reference speed of 40 KM/Hour, whereas it takes 30 minutes on average resulting in delay or time-loss of 13 minutes per trip. Project this loss time and the extra fuel during idling over total number of trips made on this stretch of road and the result becomes shocking.

SUMMARY REPORT: TRTC Brief Summary Report.pdf

Terms & Conditions

  • Free one Year Pre-paid maintenance package for TSURE vehicles acquired through Financing Facility
  • 7 days Return Guarantee to be offered by the Authorized Dealership as per their terms and conditions for cars acquired through this campaign
  • **The Customers will have the option to avail up to 30% Residual Value Financing for locally assembled Corolla, Yaris & Fortuner where vehicle is not older than 3 years
  • ***Early termination profit will be 50% waiver for existing MBL customer after completion of one year Car Ijarah period whereas it will be 100% waived after completion of two years lease.
  • **The Discounted package consists of our 4th year Comprehensive package that provides all the coverage that is provided in built in warranty. It is only sold to Yaris and Corolla vehicles and is sold at a discounted price of PKR 10,000.

Please note: This package can only be sold to cars that are within the 3 years standard built in warranty period. This package will be added to vehicle’s price, and its payment will be made by customer to MBL.